→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Cost Monitoring and Control Profile
02 · Competence·Specialized profile

Cost Monitoring and Control Profile

CP-BIM-QS-003·Publishedv1.0.0
Cost Monitoring and Control Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 2
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles2
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

A02 Finance, Accounting and (1)

  • Apply standardised metrics to measure the financial performance of BIM ProjectBIM Project — Description unavailable.s
    CI-AS-0005
    IRI 4 · RequiredICI 3 · Advanced

O04 Simulating and Quantifying (1)

Use BIModelBIModel — Description unavailable.s for Cost EstimationCost Estimation — Description unavailable.
CI-AS-0221
IRI 3 · ExpectedICI 2 · Intermediate

O08 Linking and Extending (1)

  • Connect BIModelBIModel — Description unavailable.s or their Model ComponentModel Component — Description unavailable.s to external databases
    CI-AS-0678
    IRI 3 · ExpectedICI 2 · Intermediate

A03 Performance Management (2)

  • Assess and measure the BIM readiness, capability and performance using standardized metrics
    CI-AS-0662
    IRI 3 · ExpectedICI 2 · Intermediate
  • Apply metrics to monitor the progress (or lack of progress) of BIM ImplementationBIM Implementation — Description unavailable.
    CI-AS-0003
    IRI 3 · ExpectedICI 2 · Intermediate

O03 Planning and Designing (1)

  • Use BIModelBIModel — Description unavailable.s for Value AnalysisValue Analysis — Description unavailable.
    CI-AS-0213
    IRI 3 · ExpectedICI 2 · Intermediate

O07 Monitoring and Controlling (1)

  • Use BIModelBIModel — Description unavailable.s for Performance MonitoringPerformance Monitoring — Description unavailable.
    CI-AS-0259
    IRI 3 · ExpectedICI 2 · Intermediate