Assess and measure the BIM readiness, capability and performance using standardized metrics
PublishedCI-AS-0662
Action statementAssess and measure the BIM readiness, capability and performance using standardized metrics
- type Enquiry
- statement type Determine [attribute] of (x)
Release note
This page shows a seed action statement included in Release 1.Source profiles
Profiles that include this action statement.
Source profiles
- Cost Monitoring and Control ProfileCP-BIM-QS-003Group: A03 Performance Management
- BIM Project Control ProfileCP-BIM-PM-003Group: A03 Performance Management
Inherited roles
Roles that reach this action statement through the profiles above.
Inherited roles
- Project ManagerDR-BRA-PM-001
- via BIM Project Control Profile · Primary
- Quantity SurveyorDR-BRA-QS-001
- via Cost Monitoring and Control Profile · Primary
- Construction ManagerDR-BRA-CM-001
- via Cost Monitoring and Control Profile · Supporting
Linked information uses
Information uses reached transitively through the profiles above.
Linked information uses
No information uses reached
Source references
Source references
- SRC-BIMEI-ACTIONS-260423 — BIMei Action Statements catalogue (EN/FR, 260423)