Cost Monitoring and Control Profile
CP-BIM-QS-003
Cost Monitoring and Control Profile — from v1.4 report; seed to be curated.
  • type specialized
  • roles 0
  • items 12
  • info uses 0
Persona workflow

No authored workflow for this persona yet.

Create draft workflow

Linked roles

Linked roles
No linked roles

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

A02 Finance, Accounting and (2)

  • Apply standardised metrics to measure the financial performance of BIM ProjectBIM Project — Description unavailable.s
    CI-AS-0005
    IRI 4 · RequiredICI 3 · Advanced
  • Develop cost change management protocols for BIM projects
    CI-AS-1113
    IRI 4 · RequiredICI 3 · Advanced

O04 Simulating and Quantifying (2)

  • Use BIModelBIModel — Description unavailable.s for Cost EstimationCost Estimation — Description unavailable.
    CI-AS-0221
    IRI 3 · ExpectedICI 2 · Intermediate
  • Establish model-based financial forecasting techniques
    CI-AS-1116
    IRI 3 · ExpectedICI 2 · Intermediate

O08 Linking and Extending (2)

  • Connect BIModelBIModel — Description unavailable.s or their Model ComponentModel Component — Description unavailable.s to external databases
    CI-AS-0678
    IRI 3 · ExpectedICI 2 · Intermediate
  • Develop integration methods between cost control systems and BIM
    CI-AS-1117
    IRI 3 · ExpectedICI 2 · Intermediate

A03 Performance Management (4)

  • Assess and measure the BIM readiness, capability and performance using standardized metrics
    CI-AS-0662
    IRI 3 · ExpectedICI 2 · Intermediate
  • Apply metrics to monitor the progress (or lack of progress) of BIM ImplementationBIM Implementation — Description unavailable.
    CI-AS-0003
    IRI 3 · ExpectedICI 2 · Intermediate
  • Create earned value measurement methodologies using model data
    CI-AS-1114
    IRI 4 · RequiredICI 3 · Advanced
  • Implement cost performance reporting frameworks
    CI-AS-1115
    IRI 3 · ExpectedICI 2 · Intermediate

O03 Planning and Designing (1)

  • Use BIModelBIModel — Description unavailable.s for Value AnalysisValue Analysis — Description unavailable.
    CI-AS-0213
    IRI 3 · ExpectedICI 2 · Intermediate

O07 Monitoring and Controlling (1)

  • Use BIModelBIModel — Description unavailable.s for Performance MonitoringPerformance Monitoring — Description unavailable.
    CI-AS-0259
    IRI 3 · ExpectedICI 2 · Intermediate

Information uses

Information uses
No information uses linked

Source references

Source references
  • SRC-BIM-ROLES-V1-4BIM Roles and Competency Profiles for Brazil v1.4