→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Cost Monitoring and Control Profile
02 · Competence·Specialized profile

Cost Monitoring and Control Profile

CP-BIM-QS-003·Publishedv1.0.0
Cost Monitoring and Control Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 2
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles2
  • Items7
  • Info uses0
  • Recognition
  • Sources1
  1. 2Linked roles2 roles use this profile→
  2. Cost Monitoring and Control ProfileCP-BIM-QS-003
    →
  3. 7Competency itemsacross 6 topics
Cost Monitoring and Cont…Cost Monitoring and Control ProfileProfileQuantity SurveyorDR-BRA-QS-001Construction ManagerDR-BRA-CM-001Apply standardised metrics…Apply standardised metrics to measure the financial performance of [[BIM Project]]sCI-AS-0005Use [[BIModel]]s for [[Cos…Use [[BIModel]]s for [[Cost Estimation]]CI-AS-0221Connect [[BIModel]]s or th…Connect [[BIModel]]s or their [[Model Component]]s to external databasesCI-AS-0678Assess and measure the BIM…Assess and measure the BIM readiness, capability and performance using standardized metricsCI-AS-0662Apply metrics to monitor t…Apply metrics to monitor the progress (or lack of progress) of [[BIM Implementation]]CI-AS-0003Use [[BIModel]]s for [[Val…Use [[BIModel]]s for [[Value Analysis]]CI-AS-0213Use [[BIModel]]s for [[Per…Use [[BIModel]]s for [[Performance Monitoring]]CI-AS-0259
Relationships: Cost Monitoring and Control Profile