→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●BIM Project Control Profile
02 · Competence·Specialized profile

BIM Project Control Profile

CP-BIM-PM-003·Publishedv1.0.0
BIM Project Control Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 1
  • items 6
  • info uses 0
  • Overview
  • Lineage
  • Linked roles1
  • Items6
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

O03 Planning and Designing (1)

  • Use BIModelBIModel — Description unavailable.s for Construction PlanningConstruction Planning — Description unavailable.
    CI-AS-0203
    IRI 4 · RequiredICI 3 · Advanced

O05 Constructing and Fabricating (1)

  • Use BIModelBIModel — Description unavailable.s for Construction LogisticsConstruction Logistics — Description unavailable.
CI-AS-0245
IRI 3 · ExpectedICI 2 · Intermediate

O04 Simulating and Quantifying (1)

  • Use BIModelBIModel — Description unavailable.s for Cost EstimationCost Estimation — Description unavailable.
    CI-AS-0221
    IRI 3 · ExpectedICI 2 · Intermediate

I07 Guides and Manuals (1)

  • Document lessons learned, recommendations or best practices from completed BIM ProjectBIM Project — Description unavailable.s
    CI-AS-0057
    IRI 3 · ExpectedICI 2 · Intermediate

A03 Performance Management (2)

  • Assess and measure the BIM readiness, capability and performance using standardized metrics
    CI-AS-0662
    IRI 3 · ExpectedICI 2 · Intermediate
  • Apply metrics to monitor the progress (or lack of progress) of BIM ImplementationBIM Implementation — Description unavailable.
    CI-AS-0003
    IRI 3 · ExpectedICI 2 · Intermediate