→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●BIM Project Control Profile
02 · Competence·Specialized profile

BIM Project Control Profile

CP-BIM-PM-003·Publishedv1.0.0
BIM Project Control Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 1
  • items 6
  • info uses 0
  • Overview
  • Lineage
  • Linked roles1
  • Items6
  • Info uses0
  • Recognition
  • Sources1
  1. 1Linked rolesProject Manager→
  2. BIM Project Control ProfileCP-BIM-PM-003
    →
  3. 6Competency itemsacross 5 topics
BIM Project Control Prof…BIM Project Control ProfileProfileProject ManagerDR-BRA-PM-001Use [[BIModel]]s for [[Con…Use [[BIModel]]s for [[Construction Planning]]CI-AS-0203Use [[BIModel]]s for [[Con…Use [[BIModel]]s for [[Construction Logistics]]CI-AS-0245Use [[BIModel]]s for [[Cos…Use [[BIModel]]s for [[Cost Estimation]]CI-AS-0221Document lessons learned, …Document lessons learned, recommendations or best practices from completed [[BIM Project]]sCI-AS-0057Assess and measure the BIM…Assess and measure the BIM readiness, capability and performance using standardized metricsCI-AS-0662Apply metrics to monitor t…Apply metrics to monitor the progress (or lack of progress) of [[BIM Implementation]]CI-AS-0003
Relationships: BIM Project Control Profile