BIM Project Control Profile
CP-BIM-PM-003
BIM Project Control Profile — from v1.4 report; seed to be curated.
  • type specialized
  • roles 0
  • items 12
  • info uses 0
Persona workflow

No authored workflow for this persona yet.

Create draft workflow

Linked roles

Linked roles
No linked roles

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

O03 Planning and Designing (2)

  • Use BIModelBIModel — Description unavailable.s for Construction PlanningConstruction Planning — Description unavailable.
    CI-AS-0203
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for 4D Scheduling
    CI-AS-1097
    IRI 3 · ExpectedICI 2 · Intermediate
    Use BIModelBIModel — Description unavailable.s for 4D Scheduling4D Scheduling — Description unavailable.

O05 Constructing and Fabricating (1)

  • Use BIModelBIModel — Description unavailable.s for Construction LogisticsConstruction Logistics — Description unavailable.
    CI-AS-0245
    IRI 3 · ExpectedICI 2 · Intermediate

O04 Simulating and Quantifying (3)

  • Use BIModelBIModel — Description unavailable.s for Cost EstimationCost Estimation — Description unavailable.
    CI-AS-0221
    IRI 3 · ExpectedICI 2 · Intermediate
  • Create progress monitoring methodologies using model-based data
    CI-AS-1099
    IRI 3 · ExpectedICI 2 · Intermediate
  • Establish model-based project forecasting techniques
    CI-AS-1101
    IRI 3 · ExpectedICI 2 · Intermediate

I07 Guides and Manuals (1)

  • Document lessons learned, recommendations or best practices from completed BIM ProjectBIM Project — Description unavailable.s
    CI-AS-0057
    IRI 3 · ExpectedICI 2 · Intermediate

A03 Performance Management (2)

  • Assess and measure the BIM readiness, capability and performance using standardized metrics
    CI-AS-0662
    IRI 3 · ExpectedICI 2 · Intermediate
  • Apply metrics to monitor the progress (or lack of progress) of BIM ImplementationBIM Implementation — Description unavailable.
    CI-AS-0003
    IRI 3 · ExpectedICI 2 · Intermediate

F04 Project Management (2)

  • Develop project change management protocols for BIM workflows
    CI-AS-1098
    IRI 4 · RequiredICI 3 · Advanced
  • Develop project recovery strategies using BIM processes
    CI-AS-1102
    IRI 3 · ExpectedICI 2 · Intermediate

A08 Risk Management (1)

  • Implement BIM-based risk management strategies
    CI-AS-1100
    IRI 3 · ExpectedICI 2 · Intermediate

Information uses

Information uses
No information uses linked

Source references

Source references
  • SRC-BIM-ROLES-V1-4BIM Roles and Competency Profiles for Brazil v1.4