Operations and Maintenance Profile
CP-BIM-FM-002
Operations and Maintenance Profile — from v1.4 report; seed to be curated.
  • type specialized
  • roles 0
  • items 12
  • info uses 0
Persona workflow

No authored workflow for this persona yet.

Create draft workflow

Linked roles

Linked roles
No linked roles

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

O06 Operating and Maintaining (8)

  • Use BIModelBIModel — Description unavailable.s to operate, manage and maintain a facility
    CI-AS-0676
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Asset MaintenanceAsset Maintenance — Description unavailable.
    CI-AS-0250
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Asset TrackingAsset Tracking — Description unavailable.
    CI-AS-0252
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Building InspectionBuilding Inspection — Description unavailable.
    CI-AS-0253
    IRI 3 · ExpectedICI 2 · Intermediate
  • Use BIModelBIModel — Description unavailable.s for Space ManagementSpace Management — Description unavailable.
    CI-AS-0256
    IRI 3 · ExpectedICI 2 · Intermediate
  • Use BIModelBIModel — Description unavailable.s for Handover and CommissioningHandover and Commissioning — Description unavailable.
    CI-AS-0254
    IRI 4 · RequiredICI 3 · Advanced
  • Develop preventive maintenance scheduling workflows using BIM
    CI-AS-1138
    IRI 4 · RequiredICI 3 · Advanced
  • Establish maintenance history tracking methodologies
    CI-AS-1141
    IRI 3 · ExpectedICI 2 · Intermediate

O03 Planning and Designing (1)

  • Use BIModelBIModel — Description unavailable.s for Lift PlanningLift Planning — Description unavailable.
    CI-AS-0208
    IRI 3 · ExpectedICI 2 · Intermediate

A09 Quality Management (1)

  • Create asset condition assessment protocols
    CI-AS-1139
    IRI 4 · RequiredICI 3 · Advanced

O08 Linking and Extending (1)

  • Implement work order management integration with BIM
    CI-AS-1140
    IRI 3 · ExpectedICI 2 · Intermediate

A01 Administration, Policies and (1)

  • Develop warranty and service life management approaches
    CI-AS-1142
    IRI 3 · ExpectedICI 2 · Intermediate

Information uses

Information uses
No information uses linked

Source references

Source references
  • SRC-BIM-ROLES-V1-4BIM Roles and Competency Profiles for Brazil v1.4