→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Operations and Maintenance Profile
02 · Competence·Specialized profile

Operations and Maintenance Profile

CP-BIM-FM-002·Publishedv1.0.0
Operations and Maintenance Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 1
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles1
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

O06 Operating and Maintaining (6)

  • Use BIModelBIModel — Description unavailable.s to operate, manage and maintain a facility
    CI-AS-0676
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Asset MaintenanceAsset Maintenance — Description unavailable.
CI-AS-0250
IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Asset TrackingAsset Tracking — Description unavailable.
    CI-AS-0252
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Building InspectionBuilding Inspection — Description unavailable.
    CI-AS-0253
    IRI 3 · ExpectedICI 2 · Intermediate
  • Use BIModelBIModel — Description unavailable.s for Space ManagementSpace Management — Description unavailable.
    CI-AS-0256
    IRI 3 · ExpectedICI 2 · Intermediate
  • Use BIModelBIModel — Description unavailable.s for Handover and CommissioningHandover and Commissioning — Description unavailable.
    CI-AS-0254
    IRI 4 · RequiredICI 3 · Advanced
  • O03 Planning and Designing (1)

    • Use BIModelBIModel — Description unavailable.s for Lift PlanningLift Planning — Description unavailable.
      CI-AS-0208
      IRI 3 · ExpectedICI 2 · Intermediate