→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Model-based Collaboration Profile
02 · Competence·Specialized profile

Model-based Collaboration Profile

CP-BIM-MCOL-003·Publishedv1.0.0
Model-centric coordination, review, and communication tasks.
A specialized profile used where collaboration is driven through coordinated digital models.
?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 6
  • items 6
  • info uses 1
Context
disciplineBIMdisciplineArchitecturedisciplineEngineeringjurisdictionhigh
  • Overview
  • Lineage
  • Linked roles6
  • Items6
  • Info uses1
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

model-collaboration (1)

  • Review coordinated models to support issue resolution and exchange readiness.
    CI-BIM-MCOL-001
    IRI 4 · RequiredICI 3 · Advanced
    Review coordinated models

T07 Model Management (1)

Identify the number projects in which you conducted Model ValidationModel Validation — Description unavailable. of IFC (Industry Foundation ClassesIndustry Foundation Classes — Description unavailable.) model files
CI-AS-0115
IRI 4 · RequiredICI 3 · Advanced

O04 Simulating and Quantifying (1)

  • Use BIModelBIModel — Description unavailable.s for Code Checking & ValidationCode Checking & Validation — Description unavailable.
    CI-AS-0218
    IRI 4 · RequiredICI 3 · Advanced

F02 Collaboration (1)

  • Establish if an organisation has experience in aggregating Information ModelInformation Model — Description unavailable.s into an Asset Information ModelAsset Information Model — Description unavailable.
    CI-AS-0509
    IRI 4 · RequiredICI 3 · Advanced

A09 Quality Management (2)

  • Review and accept the Information ModelInformation Model — Description unavailable.
    CI-AS-0559
    IRI 4 · RequiredICI 3 · Advanced
  • Check Project Information ModelProject Information Model — Description unavailable.s for compliance with information production methods and procedures
    CI-AS-0540
    IRI 4 · RequiredICI 3 · Advanced