Model-based Collaboration Profile
CP-BIM-MCOL-003
Model-centric coordination, review, and communication tasks.
A specialized profile used where collaboration is driven through coordinated digital models.
  • type specialized
  • roles 2
  • items 10
  • info uses 1
Persona workflow

No authored workflow for this persona yet.

Create draft workflow

Linked roles

Linked roles

Primary (1)

  • BIM Coordinator
    DR-BIM-COORD-001
    Coordinates model-based collaboration and technical delivery activities.
    IRI 4 · RequiredICI 3 · Advanced

Supporting (1)

  • BIM Manager
    DR-BIM-MGR-001
    Leads BIM implementation and governance within an organisation and across projects.
    IRI 2 · RecommendedICI 2 · Intermediate

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

model-collaboration (1)

  • Review coordinated models to support issue resolution and exchange readiness.
    CI-BIM-MCOL-001
    Review coordinated models

T07 Model Management (2)

  • Identify the number projects in which you conducted Model ValidationModel Validation — Description unavailable. of IFC (Industry Foundation ClassesIndustry Foundation Classes — Description unavailable.) model files
    CI-AS-0115
    IRI 4 · RequiredICI 3 · Advanced
  • Develop model federation strategies for complex projects
    CI-AS-1010
    IRI 4 · RequiredICI 3 · Advanced

O04 Simulating and Quantifying (2)

  • Use BIModelBIModel — Description unavailable.s for Code Checking & ValidationCode Checking & Validation — Description unavailable.
    CI-AS-0218
    IRI 4 · RequiredICI 3 · Advanced
  • Implement clash detection and issue management protocols
    CI-AS-1009
    IRI 4 · RequiredICI 3 · Advanced

F02 Collaboration (3)

  • Establish if an organisation has experience in aggregating Information ModelInformation Model — Description unavailable.s into an Asset Information ModelAsset Information Model — Description unavailable.
    CI-AS-0509
    IRI 4 · RequiredICI 3 · Advanced
  • Establish model coordination workflows across disciplines
    CI-AS-1008
    IRI 4 · RequiredICI 3 · Advanced
  • Create model-based handover procedures between project phases
    CI-AS-1011
    IRI 3 · ExpectedICI 2 · Intermediate

A09 Quality Management (2)

  • Review and accept the Information ModelInformation Model — Description unavailable.
    CI-AS-0559
    IRI 4 · RequiredICI 3 · Advanced
  • Check Project Information ModelProject Information Model — Description unavailable.s for compliance with information production methods and procedures
    CI-AS-0540
    IRI 4 · RequiredICI 3 · Advanced

Information uses

Information uses

High relevance (1)

  • Clash Detection
    IU-MOD-4040
    Model use for identifying clashes and coordination issues.

Source references

Source references
  • SRC-BIM-ROLES-V1-4BIM Roles and Competency Profiles for Brazil v1.4