→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Consultant Coordination Profile
02 · Competence·Specialized profile

Consultant Coordination Profile

CP-SA-CONSULT-004·Publishedv1.0.0
Consultant Coordination Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 1
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles1
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

F02 Collaboration (2)

  • Negotiate Data Exchange ProtocolData Exchange Protocol — Description unavailable.s with other Project ParticipantProject Participant — Description unavailable.s at/before the start of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0026
    IRI 4 · RequiredICI 3 · Advanced
  • Develop the guides for model-based collaboration between Project ParticipantProject Participant — Description unavailable.s
CI-AS-0668
IRI 3 · ExpectedICI 3 · Advanced

F03 Facilitation (1)

  • Act as a BIM FacilitatorBIM Facilitator — Description unavailable. during the delivery of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0027
    IRI 4 · RequiredICI 3 · Advanced

A06 Tendering and Procurement (1)

  • Assess the BIM CapabilityBIM Capability — Description unavailable. of Project PartnerProject Partner — Description unavailable.s, Project ParticipantProject Participant — Description unavailable.s, or BIM Service ProviderBIM Service Provider — Description unavailable.s
    CI-AS-0017
    IRI 3 · ExpectedICI 3 · Advanced

O04 Simulating and Quantifying (1)

  • Use BIModelBIModel — Description unavailable.s for Code Checking & ValidationCode Checking & Validation — Description unavailable.
    CI-AS-0218
    IRI 3 · ExpectedICI 3 · Advanced

T08 Document Management (1)

  • Establish the processes and procedures to be used by Project ParticipantProject Participant — Description unavailable.s within Common Data EnvironmentCommon Data Environment — Description unavailable.
    CI-AS-0113
    IRI 3 · ExpectedICI 3 · Advanced

A09 Quality Management (1)

  • Review and accept the Information ModelInformation Model — Description unavailable.
    CI-AS-0559
    IRI 3 · ExpectedICI 3 · Advanced