Consultant Coordination Profile
CP-SA-CONSULT-004
Consultant Coordination Profile — from v1.4 report; seed to be curated.
  • type specialized
  • roles 0
  • items 12
  • info uses 0
Persona workflow

No authored workflow for this persona yet.

Create draft workflow

Linked roles

Linked roles
No linked roles

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

F02 Collaboration (4)

  • Negotiate Data Exchange ProtocolData Exchange Protocol — Description unavailable.s with other Project ParticipantProject Participant — Description unavailable.s at/before the start of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0026
    IRI 4 · RequiredICI 3 · Advanced
  • Develop the guides for model-based collaboration between Project ParticipantProject Participant — Description unavailable.s
    CI-AS-0668
    IRI 3 · ExpectedICI 3 · Advanced
  • Develop interdisciplinary coordination frameworks for BIM projects
    CI-AS-1178
    IRI 4 · RequiredICI 3 · Advanced
  • Create consultant integration protocols for design teams
    CI-AS-1179
    IRI 4 · RequiredICI 3 · Advanced

F03 Facilitation (4)

  • Act as a BIM FacilitatorBIM Facilitator — Description unavailable. during the delivery of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0027
    IRI 4 · RequiredICI 3 · Advanced
  • Implement coordination meeting facilitation methodologies
    CI-AS-1180
    IRI 3 · ExpectedICI 3 · Advanced
  • Establish design review procedures for consultant coordination
    CI-AS-1181
    IRI 3 · ExpectedICI 3 · Advanced
  • Develop design conflict resolution strategies
    CI-AS-1182
    IRI 3 · ExpectedICI 3 · Advanced

A06 Tendering and Procurement (1)

  • Assess the BIM CapabilityBIM Capability — Description unavailable. of Project PartnerProject Partner — Description unavailable.s, Project ParticipantProject Participant — Description unavailable.s, or BIM Service ProviderBIM Service Provider — Description unavailable.s
    CI-AS-0017
    IRI 3 · ExpectedICI 3 · Advanced

O04 Simulating and Quantifying (1)

  • Use BIModelBIModel — Description unavailable.s for Code Checking & ValidationCode Checking & Validation — Description unavailable.
    CI-AS-0218
    IRI 3 · ExpectedICI 3 · Advanced

T08 Document Management (1)

  • Establish the processes and procedures to be used by Project ParticipantProject Participant — Description unavailable.s within Common Data EnvironmentCommon Data Environment — Description unavailable.
    CI-AS-0113
    IRI 3 · ExpectedICI 3 · Advanced

A09 Quality Management (1)

  • Review and accept the Information ModelInformation Model — Description unavailable.
    CI-AS-0559
    IRI 3 · ExpectedICI 3 · Advanced

Information uses

Information uses
No information uses linked

Source references

Source references
  • SRC-BIM-ROLES-V1-4BIM Roles and Competency Profiles for Brazil v1.4