Construction Planning Profile
CP-BIM-CM-001
Construction Planning Profile — from v1.4 report; seed to be curated.
  • type specialized
  • roles 0
  • items 12
  • info uses 0
Persona workflow

No authored workflow for this persona yet.

Create draft workflow

Linked roles

Linked roles
No linked roles

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

O03 Planning and Designing (6)

  • Use BIModelBIModel — Description unavailable.s for Construction PlanningConstruction Planning — Description unavailable.
    CI-AS-0203
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Lean Process AnalysisLean Process Analysis — Description unavailable.
    CI-AS-0207
    IRI 3 · ExpectedICI 2 · Intermediate
  • Develop 4D construction sequencing methodologies
    CI-AS-1118
    IRI 4 · RequiredICI 3 · Advanced
  • Create site utilization planning workflows using BIM
    CI-AS-1119
    IRI 4 · RequiredICI 3 · Advanced
  • Establish construction work packaging strategies using model data
    CI-AS-1121
    IRI 3 · ExpectedICI 2 · Intermediate
  • Develop construction method statement generation protocols
    CI-AS-1122
    IRI 3 · ExpectedICI 2 · Intermediate

O05 Constructing and Fabricating (3)

  • Use BIModelBIModel — Description unavailable.s for Construction LogisticsConstruction Logistics — Description unavailable.
    CI-AS-0245
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Site Set-outs
    CI-AS-0249
    IRI 3 · ExpectedICI 2 · Intermediate
    Use BIModelBIModel — Description unavailable.s for Site Set-outsSite Set-outs — Description unavailable.
  • Implement temporary works modeling approaches
    CI-AS-1120
    IRI 3 · ExpectedICI 2 · Intermediate

O04 Simulating and Quantifying (3)

  • Use BIModelBIModel — Description unavailable.s for Constructability AnalysisConstructability Analysis — Description unavailable.
    CI-AS-0219
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Site AnalysisSite Analysis — Description unavailable.
    CI-AS-0232
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Construction Operation AnalysisConstruction Operation Analysis — Description unavailable.
    CI-AS-0220
    IRI 3 · ExpectedICI 2 · Intermediate

Information uses

Information uses
No information uses linked

Source references

Source references
  • SRC-BIM-ROLES-V1-4BIM Roles and Competency Profiles for Brazil v1.4