→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Construction Planning Profile
02 · Competence·Specialized profile

Construction Planning Profile

CP-BIM-CM-001·Publishedv1.0.0
Construction Planning Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 3
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles3
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

O03 Planning and Designing (2)

  • Use BIModelBIModel — Description unavailable.s for Construction PlanningConstruction Planning — Description unavailable.
    CI-AS-0203
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Lean Process AnalysisLean Process Analysis — Description unavailable.
CI-AS-0207
IRI 3 · ExpectedICI 2 · Intermediate

O05 Constructing and Fabricating (2)

  • Use BIModelBIModel — Description unavailable.s for Construction LogisticsConstruction Logistics — Description unavailable.
    CI-AS-0245
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Site Set-outs
    CI-AS-0249
    IRI 3 · ExpectedICI 2 · Intermediate
    Use BIModelBIModel — Description unavailable.s for Site Set-outsSite Set-outs — Description unavailable.

O04 Simulating and Quantifying (3)

  • Use BIModelBIModel — Description unavailable.s for Constructability AnalysisConstructability Analysis — Description unavailable.
    CI-AS-0219
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Site AnalysisSite Analysis — Description unavailable.
    CI-AS-0232
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Construction Operation AnalysisConstruction Operation Analysis — Description unavailable.
    CI-AS-0220
    IRI 3 · ExpectedICI 2 · Intermediate