→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●BIM-based Project Coordination Profile
02 · Competence·Specialized profile

BIM-based Project Coordination Profile

CP-BIM-PM-002·Publishedv1.0.0
BIM-based Project Coordination Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 3
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles3
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

F03 Facilitation (1)

  • Act as a BIM FacilitatorBIM Facilitator — Description unavailable. during the delivery of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0027
    IRI 4 · RequiredICI 3 · Advanced

F05 Team and Workflow (1)

  • Manage teams involved in the delivery of BIM ProjectBIM Project — Description unavailable.s
CI-AS-0670
IRI 4 · RequiredICI 3 · Advanced

T08 Document Management (1)

  • Establish the processes and procedures to be used by Project ParticipantProject Participant — Description unavailable.s within Common Data EnvironmentCommon Data Environment — Description unavailable.
    CI-AS-0113
    IRI 4 · RequiredICI 3 · Advanced

F02 Collaboration (1)

  • Negotiate Data Exchange ProtocolData Exchange Protocol — Description unavailable.s with other Project ParticipantProject Participant — Description unavailable.s at/before the start of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0026
    IRI 4 · RequiredICI 3 · Advanced

O04 Simulating and (1)

  • Use BIModelBIModel — Description unavailable.s for Code Checking & ValidationCode Checking & Validation — Description unavailable.
    CI-AS-0218
    IRI 4 · RequiredICI 3 · Advanced

A09 Quality Management (2)

  • Review and accept the Information ModelInformation Model — Description unavailable.
    CI-AS-0559
    IRI 4 · RequiredICI 3 · Advanced
  • Check Project Information ModelProject Information Model — Description unavailable.s for compliance with information production methods and procedures
    CI-AS-0540
    IRI 4 · RequiredICI 3 · Advanced