BIM-based Project Coordination Profile
CP-BIM-PM-002
BIM-based Project Coordination Profile — from v1.4 report; seed to be curated.
  • type specialized
  • roles 0
  • items 12
  • info uses 0
Persona workflow

No authored workflow for this persona yet.

Create draft workflow

Linked roles

Linked roles
No linked roles

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

F03 Facilitation (2)

  • Act as a BIM FacilitatorBIM Facilitator — Description unavailable. during the delivery of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0027
    IRI 4 · RequiredICI 3 · Advanced
  • Establish design review procedures using BIM
    CI-AS-1095
    IRI 3 · ExpectedICI 2 · Intermediate

F05 Team and Workflow (1)

  • Manage teams involved in the delivery of BIM ProjectBIM Project — Description unavailable.s
    CI-AS-0670
    IRI 4 · RequiredICI 3 · Advanced

T08 Document Management (1)

  • Establish the processes and procedures to be used by Project ParticipantProject Participant — Description unavailable.s within Common Data EnvironmentCommon Data Environment — Description unavailable.
    CI-AS-0113
    IRI 4 · RequiredICI 3 · Advanced

F02 Collaboration (2)

  • Negotiate Data Exchange ProtocolData Exchange Protocol — Description unavailable.s with other Project ParticipantProject Participant — Description unavailable.s at/before the start of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0026
    IRI 4 · RequiredICI 3 · Advanced
  • Develop interdisciplinary coordination workflows
    CI-AS-1092
    IRI 4 · RequiredICI 3 · Advanced

O04 Simulating and (1)

  • Use BIModelBIModel — Description unavailable.s for Code Checking & ValidationCode Checking & Validation — Description unavailable.
    CI-AS-0218
    IRI 4 · RequiredICI 3 · Advanced

A09 Quality Management (4)

  • Review and accept the Information ModelInformation Model — Description unavailable.
    CI-AS-0559
    IRI 4 · RequiredICI 3 · Advanced
  • Check Project Information ModelProject Information Model — Description unavailable.s for compliance with information production methods and procedures
    CI-AS-0540
    IRI 4 · RequiredICI 3 · Advanced
  • Implement issue tracking and resolution methodologies
    CI-AS-1094
    IRI 3 · ExpectedICI 2 · Intermediate
  • Develop model validation criteria for design coordination
    CI-AS-1096
    IRI 3 · ExpectedICI 2 · Intermediate

T07 Model Management (1)

  • Create model federation protocols for project coordination
    CI-AS-1093
    IRI 4 · RequiredICI 3 · Advanced

Information uses

Information uses
No information uses linked

Source references

Source references
  • SRC-BIM-ROLES-V1-4BIM Roles and Competency Profiles for Brazil v1.4