Model-based Interoperability Profile
CP-BIM-INT-009
Model-based Interoperability Profile — from v1.4 report; seed to be curated.
  • type specialized
  • roles 0
  • items 12
  • info uses 0
Persona workflow

No authored workflow for this persona yet.

Create draft workflow

Linked roles

Linked roles
No linked roles

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

T09 Data Management (8)

  • Generate high-quality IFC (Industry Foundation ClassesIndustry Foundation Classes — Description unavailable.) model files from proprietary BIM Software ToolBIM Software Tool — Description unavailable.s
    CI-AS-0114
    IRI 4 · RequiredICI 3 · Advanced
  • Establish the capability of an organisation to generate high-quality Industry Foundation ClassesIndustry Foundation Classes — Description unavailable. (IFC) model files from proprietary BIM Software ToolBIM Software Tool — Description unavailable.s
    CI-AS-0784
    IRI 4 · RequiredICI 3 · Advanced
  • Define the use of proprietary and/or non-proprietary file formats / Data ModelData Model — Description unavailable.s (e.g. Industry Foundation ClassesIndustry Foundation Classes — Description unavailable.)
    CI-AS-0182
    IRI 4 · RequiredICI 3 · Advanced
  • Determine how many projects an organization has participated in where the Industry Foundation ClassesIndustry Foundation Classes — Description unavailable. (IFC)s were the preferred format for final submission
    CI-AS-0708
    IRI 3 · ExpectedICI 2 · Intermediate
  • Establish an organisation's experience in using OpenBIM (IFCIFC — Description unavailable., IDS, BCF) to exchange InformationInformation — Description unavailable. with Project PartnerProject Partner — Description unavailable.s
    CI-AS-0900
    IRI 3 · ExpectedICI 2 · Intermediate
    Establish an organisation's experience in using OpenBIM (IFCIFC — Description unavailable., IDS, BCFBCF — Description unavailable.) to exchange InformationInformation — Description unavailable. with Project PartnerProject Partner — Description unavailable.s
  • Link different Enterprise Systems to improve access to organisational, project, and asset information
    CI-AS-0528
    IRI 3 · ExpectedICI 3 · Advanced
  • Create data mapping strategies between different software systems
    CI-AS-1033
    IRI 4 · RequiredICI 3 · Advanced
  • Implement open standards for cross-platform information exchange
    CI-AS-1035
    IRI 3 · ExpectedICI 3 · Advanced

I03 Library (1)

  • Establish if there are Model Component LibrariesModel Component Libraries — Description unavailable. that are consistently used
    CI-AS-0448
    IRI 3 · ExpectedICI 2 · Intermediate

T07 Model (1)

  • Develop validation protocols for exchanged model data
    CI-AS-1034
    IRI 4 · RequiredICI 3 · Advanced

F02 Collaboration (1)

  • Establish interoperability requirements for different project phases
    CI-AS-1036
    IRI 3 · ExpectedICI 2 · Intermediate

A01 Administration, (1)

  • Create data exchange specification documents for project participants
    CI-AS-1037
    IRI 3 · ExpectedICI 3 · Advanced

Information uses

Information uses
No information uses linked

Source references

Source references
  • SRC-BIM-ROLES-V1-4BIM Roles and Competency Profiles for Brazil v1.4