→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Construction Information Management Profile
02 · Competence·Specialized profile

Construction Information Management Profile

CP-BIM-CM-003·Publishedv1.0.0
Construction Information Management Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 2
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles2
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

T08 Document Management (3)

  • Use a Content Management SystemContent Management System — Description unavailable. or a Document Management SystemDocument Management System — Description unavailable.s to manage information storage and sharing
    CI-AS-0116
    IRI 4 · RequiredICI 3 · Advanced
  • Operate within a Common Data EnvironmentCommon Data Environment — Description unavailable.
CI-AS-0112
IRI 4 · RequiredICI 3 · Advanced
  • Archive the project Information modelproject Information model — Description unavailable.
    CI-AS-0547
    IRI 3 · ExpectedICI 2 · Intermediate
  • A09 Quality Management (1)

    • Review and accept the Information ModelInformation Model — Description unavailable.
      CI-AS-0559
      IRI 3 · ExpectedICI 2 · Intermediate

    I07 Guides and Manuals (1)

    • Document lessons learned, recommendations or best practices from completed BIM ProjectBIM Project — Description unavailable.s
      CI-AS-0057
      IRI 3 · ExpectedICI 2 · Intermediate

    F02 Collaboration (1)

    • Establish the delivery teamdelivery team — Description unavailable.’s mobilization plan
      CI-AS-0558
      IRI 3 · ExpectedICI 2 · Intermediate
      Establish the delivery teamdelivery team — Description unavailable.’s mobilization planmobilization plan — Description unavailable.

    T05 Documentation (1)

    • Generate COBieCOBie — Description unavailable. specifications using applicable tools and templates
      CI-AS-0074
      IRI 3 · ExpectedICI 2 · Intermediate