→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●BIM-based Quantity Takeoff Profile
02 · Competence·Specialized profile

BIM-based Quantity Takeoff Profile

CP-BIM-QS-001·Publishedv1.0.0
BIM-based Quantity Takeoff Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 1
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles1
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

O04 Simulating and Quantifying (2)

  • Use BIModelBIModel — Description unavailable.s for Quantity Take-offQuantity Take-off — Description unavailable.
    CI-AS-0227
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Cost EstimationCost Estimation — Description unavailable.
CI-AS-0221
IRI 4 · RequiredICI 3 · Advanced

A02 Finance, Accounting and (2)

  • Determine project costs based on BIM DeliverableBIM Deliverable — Description unavailable.s rather than on the number of 2D Drawing2D Drawing — Description unavailable.s required
    CI-AS-0006
    IRI 4 · RequiredICI 3 · Advanced
  • Apply standardised metrics to measure the financial performance of BIM ProjectBIM Project — Description unavailable.s
    CI-AS-0005
    IRI 3 · ExpectedICI 2 · Intermediate

F01 Functional Basics (1)

  • Organise models, documents, project information, cost information and specifications according to standardised Classification SystemClassification System — Description unavailable.s (e.g. Uniclass, NRM and CESMM)
    CI-AS-0030
    IRI 4 · RequiredICI 3 · Advanced

A09 Quality Management (1)

  • Check the quality of Model ComponentModel Component — Description unavailable.s against established Modelling StandardModelling Standard — Description unavailable.s
    CI-AS-0176
    IRI 4 · RequiredICI 3 · Advanced

T07 Model Management (1)

  • Use Model Progression SpecificationsModel Progression Specifications — Description unavailable. or a similar system to manage the Level of DevelopmentLevel of Development — Description unavailable. within BIModelBIModel — Description unavailable.s
    CI-AS-0110
    IRI 3 · ExpectedICI 2 · Intermediate