Determine project costs based on BIM DeliverableBIM Deliverable — Description unavailable.s rather than on the number of 2D Drawing2D Drawing — Description unavailable.s required

CI-AS-0006
Edit
Action statementDetermine project costs based on BIM DeliverableBIM Deliverable — Description unavailable.s rather than on the number of 2D Drawing2D Drawing — Description unavailable.s required
  • type enquiry
  • label BIM Deliverable
  • label 2D Drawing
Release note
This page shows a seed action statement included in Release 1.

Source profiles

Profiles that include this action statement.

Source profiles

Inherited roles

Roles that reach this action statement through the profiles above.

Inherited roles
No roles reach this action statement

Linked information uses

Information uses reached transitively through the profiles above.

Linked information uses
No information uses reached

Source references

Source references
  • SRC-BIMEI-ACTIONS-260423BIMei Action Statements catalogue (EN/FR, 260423)