→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●5D BIM Cost Estimation Profile
02 · Competence·Specialized profile

5D BIM Cost Estimation Profile

CP-BIM-QS-002·Publishedv1.0.0
5D BIM Cost Estimation Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 1
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles1
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

O04 Simulating and Quantifying (2)

  • Use BIModelBIModel — Description unavailable.s for Cost EstimationCost Estimation — Description unavailable.
    CI-AS-0221
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Life Cycle AssessmentLife Cycle Assessment — Description unavailable.
CI-AS-0239
IRI 3 · ExpectedICI 2 · Intermediate

A02 Finance, Accounting and (2)

  • Apply standardised metrics to measure the financial performance of BIM ProjectBIM Project — Description unavailable.s
    CI-AS-0005
    IRI 4 · RequiredICI 3 · Advanced
  • Determine project costs based on BIM DeliverableBIM Deliverable — Description unavailable.s rather than on the number of 2D Drawing2D Drawing — Description unavailable.s required
    CI-AS-0006
    IRI 4 · RequiredICI 3 · Advanced

O03 Planning and Designing (1)

  • Use BIModelBIModel — Description unavailable.s for Value AnalysisValue Analysis — Description unavailable.
    CI-AS-0213
    IRI 3 · ExpectedICI 2 · Intermediate

F01 Functional Basics (1)

  • Organise models, documents, project information, cost information and specifications according to standardised Classification SystemClassification System — Description unavailable.s (e.g. Uniclass, NRM and CESMM)
    CI-AS-0030
    IRI 4 · RequiredICI 3 · Advanced

O08 Linking and Extending (1)

  • Connect BIModelBIModel — Description unavailable.s or their Model ComponentModel Component — Description unavailable.s to external databases
    CI-AS-0678
    IRI 4 · RequiredICI 3 · Advanced