Interim report — not yet client-ready

This report is circulated as an interim copy. It is complete enough to read, but the following are still outstanding:

  • 3 required elements have evidence that is not yet approved.

Published version 2 · Frozen at issue.

Supporting resources are curated separately and may be updated.

Download editable diagram
Roles Profiles Flows

Mechanical Installer

Installation, commissioning and maintenance of mechanical equipment

Mechanical Installer: providing digital handover information for installed equipment

Review copyDRAFT – working copy; not for client issue.

The scenario

A self-employed plumber running a small business has been appointed as a subcontractor to install heating equipment, including boilers, pumps and valves, on the extension and refurbishment of a post-primary school: a €14 million public project for an Education and Training Board. The plumber is experienced in installing and commissioning mechanical systems but new to formal digital information management. The main contractor requires installation records, product information, commissioning results, warranties and maintenance documentation in an agreed format through the project's . The plumber needs a simple, low-cost workflow to deliver complete handover information for every installed item, without extra software or specialist staff, ready for authorization by the main contractor and acceptance by the client by July 2027.

What success looks like

Handover information for every installed item is complete, in the agreed format and submitted through the project's CDE, without extra software or specialist staff.

How you will know

  • The information required for each item of equipment is known before installation starts.
  • Installation details and photographs are captured on site with a phone or tablet.
  • Product, commissioning, warranty and maintenance records are organised in the agreed format.
  • Compliance records and certificates are provided with the handover information.
  • Information is submitted through the project's CDE without repeated requests for missing items.

By 01/07/2027.

In one sentence

A Mechanical Installer, when the main contractor requires installation, commissioning and maintenance information to be submitted digitally through the project's CDE, must provide the digital handover information for installed heating equipment.

Activity flow diagram

Choose Vertical to follow the flow from top to bottom on a narrow screen.

MechanicalInstallerLead appointedparty (maincontractor)A phone ortablet appPaper sheets,then digitisedThe maincontractor's CDE appStart1. Clarify heatingequipment handoverinformationrequirementsSource: CWMF – Public Sector BIM Adoption Timeline2. Agree CDE uploadprotocols and namingconventions✕How will installation records becaptured on site?2.1. Capture recordswith a phone or tabletapp2.2. Record on paperand digitise each week2.3. Enter recordsdirectly in thecontractor's CDE app3. Capture on-siteequipment details andphotographs4. Collatecommissioning,compliance andwarranty records5. Validate digitalhandover submissionsagainst acceptancecriteria6. Submit completedmechanical recordsthrough project CDEEndHand-off 1, Issue: Asset data fields and handover requirements, from Lead appointed party (main contractor) to Mechanical Installer, at stage 1Hand-off 2, Issue: CDE upload protocols and naming conventions, from Lead appointed party (main contractor) to Mechanical Installer, at stage 2Hand-off 3, Submit: Equipment details and photographs, from Mechanical Installer to Lead appointed party (main contractor), at stage 3Hand-off 4, Submit: Commissioning, compliance and warranty records, from Mechanical Installer to Lead appointed party (main contractor), at stage 4Hand-off 5, Review: Check results and list of missing items, from Lead appointed party (main contractor) to Mechanical Installer, at stage 5Hand-off 6, Submit: Final handover packages through the CDE, from Mechanical Installer to Lead appointed party (main contractor), at stage 6Hand-off 7, Reject: Missing items: amend and resubmit, from Lead appointed party (main contractor) to Mechanical Installer, at stage 6, returning to stage 4Hand-off 8, Accept: Handover information accepted, from Lead appointed party (main contractor) to Mechanical Installer, at stage 6

Scroll sideways to follow the flow. With the diagram focused, use the Left and Right arrow keys.

Start / EndStageDecisionConditional path
Activity Flow Diagram AFD.gen.rbs-dr-irl-d-n9lk3ejt.V1.0. A draft provided as a template to change and customise as needed.

Explore the flow by stage

6 stages · 1 decision with 3 options

Choose a stage to see what each party does in it, the hand-offs between them and any decision that follows. A decision's options are listed under it. The hand-off numbers match the numbered arrows on the diagram.

Stage 1: Clarify heating equipment handover information requirements

Mechanical Installer

Review the main contractor's information requirements for the school extension and refurbishment to find out exactly which attributes, serial numbers and certificates are needed for each item of heating equipment before installation starts.

Responsible: Mechanical Installer

Who does what at this stage
  • Mechanical Installer

    The role

    Carries out stage 1

    Clarify heating equipment handover information requirements

    • Receives 1: Asset data fields and handover requirements from Lead appointed party (main contractor) (issue)
  • Lead appointed party (main contractor)

    ISO 19650 party

    • Sends 1: Asset data fields and handover requirements to Mechanical Installer (issue)
Hand-offs at this stage
  1. 1Asset data fields and handover requirements

    From
    Lead appointed party (main contractor)
    To
    Mechanical Installer
    Hand-off
    Issue

Checklist

0 of 8 ticked

Need this flow in your own tooling? Take an editable copy. It is a one way extract, so edits will not sync back to this report.

Download editable diagram

Key actions

Open an Action Statement in the Record using its link icon. Each opens in a new tab.

Overall action

Provide the digital handover information for installed heating equipment

  1. Check own handover information against the in the main contractor's before submitting it to the main contractor for authorization

  2. Apply the project's agreed s and metadata to digital deliverables

  3. Complete commissioning reports using agreed project templates

  4. Collate manufacturer operation and maintenance manuals with warranty certificates

  5. Conduct checks on asset data and documentation prior to sharing

  6. Upload checked handover s to the for the main contractor's authorization

1 headline and 9 detailed Action Statements are recorded. 6 key detailed actions are shown here, with accepted actions first. Read all Action Statements in the Full Scenario Record (opens in a new tab)

What this role works with

Information Uses recorded for this scenario. Review their suitability for the intended organisation and project.

Uses, Artefacts, and Tools3 items
  1. 1Equipment commissioning report
  2. 2Project information naming conventions and metadata standards
  3. 3Exchange Information Requirements (EIR)

How the scenario unfolds

6 stages · 1 decision with 3 options

Open a stage to see its activities and decisions. Guidance links open the matching section of the Record in a new tab.

Does the mandate apply?

Ireland – CWMF / Public Works. Applies

Contractors & supply chain on a public works project: the CWMF milestone in force at the 22/10/2026 commencement (over €10m, effective 01/01/2026) covers this project.

Source: CWMF – Public Sector BIM Adoption Timeline. https://cwmf.gov.ie/en/resources/bim/public-sector-bim-adoption-timeline/

Build Digital materials

The material selection and source metadata recorded for this issue. Proposed uses explain how each material supports the workflow; source availability may change.

Supporting materials

This project information standard provides spreadsheet templates and guidance for naming project information in accordance with the Irish National Annex to ISO 19650-2. The support includes the core file-naming workbook, a hyperlink checker, a presentation and a demonstration.

Standard · XLSX

Support the implementation of standard file naming conventions for mechanical handover deliverables.

Provides practical spreadsheet templates, instructions, and demonstration videos tailored to the Irish National Annex of ISO 19650-2, enabling trade subcontractors to generate compliant names without dedicated BIM software.

Included resources

This technology evaluation method provides a structured and transparent approach for assessing digital tools that support Information Management and Building Information Modelling (BIM). It establishes consistent criteria for evaluating functionality, interoperability, usability, compliance with standards such as ISO 19650, and alignment with organisational needs. The method supports objective comparison, informed decision-making, and proportionate investment, ensuring that technology acts as an enabler of defined processes rather than a driver in itself. Overall, it helps organisations select and implement technology solutions that are fit for purpose, scalable, and supportive of long-term Information Management / BIM adoption and continuous improvement.

Protocol · XLSX

Guide the evaluation of proportionate technology options for mobile site capture and CDE participation.

Assists small trade firms in objectively evaluating low-cost mobile applications and CDE field interfaces against usability, ISO 19650 alignment, and cost criteria before deployment.

Included resources

This delivery-team information management plan provides tenderers with a structured set of templates for responding to a project tender in line with ISO 19650. It covers the delivery team’s information-management function, delivery strategy objectives, federation approach, responsibilities, acceptance criteria, capability, mobilisation and risk planning.

Plan · XLSX

Provide delivery-team templates to understand subcontractor information obligations and delivery planning.

Helps the mechanical contractor understand how their information packages fit into their task information delivery plan, the main contractor's master information delivery plan and BIM execution plan, and the client's acceptance procedures under the Capital Works Management Framework (CWMF).

Included resources

About this Role-based Scenario (Persona)

This report introduces a role, its situation and a practical workflow. Use it to consider how the guidance applies to your responsibilities. The Full Scenario Record provides practical stage guidance, Learning Units, supporting materials and the review record.

Read practical guidance in the Full Scenario Record (opens in a new tab)
Organisation:
Company · Private sector
Appointment:
Supply chain
Project value:
OJEU (€5.5m–€15m)
Jurisdiction:
Ireland – CWMF
Prepared by:
Build Digital
RbS Code:
SP-RDH6M588
Issue date:
28/10/2026

Prepared by Build Digital using the Roles, Profiles, and Flows (RPF) app. RPF is developed by ChangeAgents AEC and is available as part of the BIM Excellence Initiative (BIMei).

Generated by the BIMei Scenario Builder. rpf.bimexcellence.org. Client preset.

Disclaimer: this Scenario Report is a decision support tool; it does not by itself establish a legal or contractual requirement. For more information please refer to BIMei Terms of Use.