Interim report — not yet client-ready

This report is circulated as an interim copy. It is complete enough to read, but the following are still outstanding:

  • 2 required elements have no evidence yet.

Published version 2 · Frozen at issue.

Supporting resources are curated separately and may be updated.

Download editable diagram
Roles Profiles Flows

Practice Principal, small architectural practice

Leads the practice's decisions on pursuing public-sector work and on the capability, tools and fees needed to deliver it under the BIM Mandate

Practice Principal: building a small practice's capability to win public BIM work

IncompleteDRAFT – working copy; not for client issue.

The scenario

The Practice Principal leads a small architectural practice of 4 to 20 staff with limited experience of public-sector procurement and of delivering s. Its first target is a tender to lead the design team, including a building services engineering consultancy, for a €14 million extension and refurbishment of a post-primary school for an Education and Training Board. Under the CWMF the practice would be the lead appointed party, and the tender asks whether it will also take on the information management role. Within 12 months the principal needs to build proportionate capability: a costed plan, a compliant pre-appointment , a clear decision on that role, and a public project won and delivered.

What success looks like

You can win and deliver public-sector projects with BIM requirements, starting with the ETB school tender, by building proportionate capability in training, tools and processes. You can lead the design team as lead appointed party, with a compliant pre-appointment and a clear decision on the information role.

Activity flow diagram

Choose Vertical to follow the flow from top to bottom on a narrow screen.

PracticePrincipal, smallarchitecturalpracticeAppointing party(client)Appointed party(building servicesconsultancy)Yes, within a standard,proportionate scopeYes, supported by aspecialist sub-consultantNo, the client resourcesthe role directlyStart1. Assess CWMF BIMmandate readiness2. Audit practicecapability against ISO19650Source: CWMF – Public Sector BIM Adoption Timeline3. Establish practiceBIM governance andprotocols4. Formulate practiceBIM implementationplan✕Will the practice take on thedesign-team-lead informationrole?4.1. Agree aproportionateinformation role andfee4.2. Appoint aspecialist informationsub-consultant4.3. Work with theclient-resourcedinformation role5. Prepare the tenderresponse andpre-appointment BEP6. Deliver designinformation to theagreed BEP7. Review the projectoutcome and refinecapabilityEndHand-off 1, Issue: Invitation to tender with the EIR, from Appointing party (client) to Practice Principal, small architectural practice, at stage 5Hand-off 2, Submit: Tender response with pre-appointment BEP, from Practice Principal, small architectural practice to Appointing party (client), at stage 5Hand-off 3, Approve: Appointment as design team lead, from Appointing party (client) to Practice Principal, small architectural practice, at stage 6Hand-off 4, Submit: Building services BEP input and TIDP, from Appointed party (building services consultancy) to Practice Principal, small architectural practice, at stage 6Hand-off 5, Submit: Design information model for acceptance, from Practice Principal, small architectural practice to Appointing party (client), at stage 6Hand-off 6, Reject: Rejected: amend and resubmit, from Appointing party (client) to Practice Principal, small architectural practice, at stage 7, returning to stage 6Hand-off 7, Inform: Tender result and client feedback, from Appointing party (client) to Practice Principal, small architectural practice, at stage 7

Scroll sideways to follow the flow. With the diagram focused, use the Left and Right arrow keys.

Start / EndStageDecisionConditional path
Activity Flow Diagram AFD.gen.rbs-dr-irl-d-2e07bf0w.V1.0. A draft provided as a template to change and customise as needed.

Explore the flow by stage

7 stages · 1 decision with 3 options

Choose a stage to see what each party does in it, the hand-offs between them and any decision that follows. A decision's options are listed under it. The hand-off numbers match the numbered arrows on the diagram.

Stage 1: Assess CWMF BIM mandate readiness

Practice Principal, small architectural practice

The Practice Principal confirms that the CWMF BIM requirements apply to design teams on public works projects over €5 million from 1 July 2026, so they apply to the €14 million school tender, and sets out the practice's business case and capacity to enter this market.

Responsible: Practice Principal

Who does what at this stage
  • Practice Principal, small architectural practice

    The role

    Carries out stage 1

    Assess CWMF BIM mandate readiness

No part in this stage: Appointing party (client), Appointed party (building services consultancy).

Hand-offs at this stage

No hand-offs at this stage.

Checklist

0 of 8 ticked

Need this flow in your own tooling? Take an editable copy. It is a one way extract, so edits will not sync back to this report.

Download editable diagram

Key actions

Open an Action Statement in the Record using its link icon. Each opens in a new tab.

Overall action

Develop the practice's capability to win and deliver public-sector s

  1. Manage assurance of the 's information against and the CWMF s

  2. Regularly check project design information quality against agreed information standards

  3. Select individuals whose qualifications reflect structured learning outcomes aligned with implementation, OpenBIM principles and asset lifecycle

  4. Verify information deliverable quality prior to project exchange and formal submission

  5. Support the national adoption of the series

  6. Appoint capable design team sub-consultants meeting CWMF requirements

1 headline and 38 detailed Action Statements are recorded. 6 key detailed actions are shown here, with accepted actions first. Read all Action Statements in the Full Scenario Record (opens in a new tab)

What this role works with

Information Uses recorded for this scenario. Review their suitability for the intended organisation and project.

Uses, Artefacts, and Tools6 items
  1. 1Information delivery risk assessment
  2. 2Exchange Information Requirements (EIR)
  3. 3Information Manager Role Profiles Benchmark
  4. 4Pre-appointment BIM Execution Plan (BEP)
  5. 5Capability and capacity assessment summary
  6. 6CWMF BIM Requirements and Capital Works Guidance

How the scenario unfolds

7 stages · 1 decision with 3 options

Open a stage to see its activities and decisions. Guidance links open the matching section of the Record in a new tab.

Does the mandate apply?

Ireland – CWMF / Public Works. Applies

Design team (lead appointed / appointed parties) on a public works project: the CWMF milestone in force at the 22/10/2026 commencement (over €5m, effective 01/07/2026) covers this project.

Source: CWMF – Public Sector BIM Adoption Timeline. https://cwmf.gov.ie/en/resources/bim/public-sector-bim-adoption-timeline/

Build Digital materials

The material selection and source metadata recorded for this issue. Proposed uses explain how each material supports the workflow; source availability may change.

Supporting materials

Form for assessing the applicability of Irish BIM mandate requirements to a project.

Tool · XLSX

Evaluate whether public project tenders trigger the mandatory Irish BIM requirements under the CWMF timeline.

Directly supports the Practice Principal at the initial qualification stage to determine whether the €14m school tender is subject to mandatory public BIM requirements.

This roadmap sets out a clear, practical approach for organisations to adopt and implement Information Management and Building Information Modelling (BIM) in line with ISO 19650 and the Capital Works Management Framework (CWMF). It provides a phased pathway from early capability to advanced capability, showing how organisations can progressively build skills, processes, and digital workflows while meeting the requirements of the Irish BIM mandate. The roadmap aligns organisational change with project-level delivery, emphasising the foundations of people, process, and technology, and the importance of collaboration, governance, and continuous improvement. Overall, it supports organisations in moving from basic information management to fully integrated, data-driven delivery that delivers long-term value across the asset lifecycle.

Roadmap · PDF

Provide a phased adoption roadmap for progressive development of people, process, and technology capabilities in line with CWMF.

Enables small architectural practices to establish a proportionate, step-by-step organizational pathway towards meeting public-sector BIM requirements without excessive upfront burden.

This adoption strategy provides a structured approach for organisations to plan, govern and deliver Information Management and BIM adoption. It aligns leadership intent, objectives, actions and measurable outcomes so that people, processes and technology can develop in a coordinated, proportionate way.

Strategy · XLSX

Structure leadership intent, measurable objectives, and digital adoption actions across the practice.

Guides the Practice Principal in formulating an executive strategy that aligns business goals, resourcing, and digital investment.

Included resources

This technology evaluation method provides a structured and transparent approach for assessing digital tools that support Information Management and Building Information Modelling (BIM). It establishes consistent criteria for evaluating functionality, interoperability, usability, compliance with standards such as ISO 19650, and alignment with organisational needs. The method supports objective comparison, informed decision-making, and proportionate investment, ensuring that technology acts as an enabler of defined processes rather than a driver in itself. Overall, it helps organisations select and implement technology solutions that are fit for purpose, scalable, and supportive of long-term Information Management / BIM adoption and continuous improvement.

Protocol · XLSX

Establish objective criteria to assess software and Common Data Environment tools for ISO 19650 compliance and organisational fit.

Assists the practice during the systems audit to evaluate current software authoring tools and select proportionate CDE platforms without over-investing.

Included resources

This project information standard provides spreadsheet templates and guidance for naming project information in accordance with the Irish National Annex to ISO 19650-2. The support includes the core file-naming workbook, a hyperlink checker, a presentation and a demonstration.

Standard · XLSX

Provide standard spreadsheet templates and rules for container naming conforming to the Irish National Annex to ISO 19650-2.

Supplies concrete, ready-to-use templates for defining practice naming conventions and performing automated verification checks on design deliverables.

Included resources

This report defines Information Manager (BIM) role profiles for the Irish built-environment sector. It supports the development of the digital capability needed for more transparent, consistent and long-term infrastructure delivery.

Report · PDF

Define standard competency profiles and task allocations for the Information Manager function.

Assists the Practice Principal in clarifying the Lead Appointed Party information management duties, evaluating whether to assign them in-house or appoint a specialist sub-consultant.

Included resources

This delivery-team information management plan provides tenderers with a structured set of templates for responding to a project tender in line with ISO 19650. It covers the delivery team’s information-management function, delivery strategy objectives, federation approach, responsibilities, acceptance criteria, capability, mobilisation and risk planning.

Plan · XLSX

Provide delivery-team templates for structuring tender responses, capability assessments, and pre-appointment BIM Execution Plans in accordance with ISO 19650.

Serves as the foundational template for assembling the pre-appointment BEP, delivery strategy, and federation procedures for the public school tender submission.

Included resources

This support presents the CWMF-to-ISO 19650-2 process workflows, including the Stage (i) feasibility study and preliminary report workflow. It is published as a single PDF support for information-management activities across appointing and appointed parties.

Workflow · PDF

Map information management workflows from CWMF stages to ISO 19650-2 delivery-phase activities.

Offers clear guidance for structuring information exchange gates, coordinating the multidisciplinary design team, and maintaining CWMF compliance through design development.

Included resources

About this Role-based Scenario (Persona)

This report introduces a role, its situation and a practical workflow. Use it to consider how the guidance applies to your responsibilities. The Full Scenario Record provides practical stage guidance, Learning Units, supporting materials and the review record.

Read practical guidance in the Full Scenario Record (opens in a new tab)
Organisation:
Consultancy · Private sector
Appointment:
Lead appointed party
Project value:
OJEU (€5.5m–€15m)
Jurisdiction:
Ireland – CWMF
Prepared by:
Build Digital
RbS Code:
SP-DD13NX0F
Issue date:
28/10/2026

Prepared by Build Digital using the Roles, Profiles, and Flows (RPF) app. RPF is developed by ChangeAgents AEC and is available as part of the BIM Excellence Initiative (BIMei).

Generated by the BIMei Scenario Builder. rpf.bimexcellence.org. Client preset.

Disclaimer: this Scenario Report is a decision support tool; it does not by itself establish a legal or contractual requirement. For more information please refer to BIMei Terms of Use.