Information Manager (BIM)

Establishing, implementing and overseeing information management processes within a public client organisation and across its capital projects

Information Manager (BIM): establishing information management for a public client

Review copyDRAFT – working copy; not for client issue.

The scenario

The Information Manager (BIM) works for an Education and Training Board, a public client acting as the in Ireland under the CWMF. The ETB is delivering several projects under the BIM Mandate, but its departments have varying BIM experience, inconsistent information requirements and no standard approach. Information handed over from consultant-managed common data environments is not consistently structured for future use. Their task is to build a consistent, proportionate approach to that works across projects and departments, starting with a €14 million post-primary school extension and refurbishment. By mid 2027, requirements, standards and assurance should be in place, Project Coordinators should apply them unaided, and the ETB should retain usable information after completion.

What success looks like

You can give your ETB a consistent, proportionate approach to that works across every project and department, starting with the €14 million post-primary school, so that information delivered by the design team and contractor is retained and usable long after completion.

Activity flow diagram

Choose Vertical to follow the flow from top to bottom on a narrow screen.

InformationManager (BIM)ProjectCoordinatorLead appointedpartyContractorDeliverablesmeet all EIRacceptancecriteriaInformationdeliverablesrequirecorrectiverevisionsStart1. Audit baseline ETBinformation managementmaturity2. Establish ETB OIR,AIR, and PIR frameworkSource: CWMF – Public Sector BIM Adoption Timeline3. Embed CWMF EIR intoappointment documents4. Configure clientCDE and assess leadBEP5. Assure federatedmodels and asset data✕Do the delivered federated modelsand asset datasets meet EIRacceptance criteria?5.1. Coordinatecorrection ofnon-compliantinformation containers6. Transfer verifiedAIM to post-primaryschool operationsEndHand-off 1, Issue: Exchange Information Requirements and appointment protocol, from Information Manager (BIM) to Project Coordinator, at stage 3Hand-off 2, Submit: BIM Execution Plan and Master Information Delivery Plan, from Lead appointed party to Information Manager (BIM), at stage 4Hand-off 3, Submit: Federated Information Model and design data containers, from Lead appointed party to Information Manager (BIM), at stage 5Hand-off 4, Submit: As-built asset information and COBie deliverables, from Contractor to Information Manager (BIM), at stage 5Hand-off 5, Reject: Non-conformance notice and required model revisions, from Information Manager (BIM) to Lead appointed party, at stage 5.1, returning to stage 5Hand-off 6, Issue: Verified Asset Information Model and assurance sign-off, from Information Manager (BIM) to Project Coordinator, at stage 6

Scroll sideways to follow the flow. With the diagram focused, use the Left and Right arrow keys.

Start / EndStageDecisionConditional path
Activity Flow Diagram AFD.gen.rbs-dr-irl-d-tw7ldtz3.V1.0. A draft provided as a template to change and customise as needed.

Explore the flow by stage

6 stages · 1 decision with 2 options

Choose a stage to see what each party does in it, the hand-offs between them and any decision that follows. A decision's options are listed under it. The hand-off numbers match the numbered arrows on the diagram.

Stage 1: Audit baseline ETB information management maturity

Information Manager (BIM)

Review existing consultant-managed CDE arrangements and documentation across ETB departments to establish baseline information practices under the CWMF BIM Mandate.

Responsible: Information Manager (BIM)

Who does what at this stage
  • Information Manager (BIM)

    The role

    Carries out stage 1

    Audit baseline ETB information management maturity

No part in this stage: Project Coordinator, Lead appointed party, Contractor.

Hand-offs at this stage

No hand-offs at this stage.

Checklist

0 of 8 ticked

Need this flow in your own tooling? Take an editable copy. It is a one way extract, so edits will not sync back to this report.

Download editable diagram

Key actions

Open an Action Statement in the Record using its link icon. Each opens in a new tab.

Overall action

Establish the organisation's approach

  1. Capture s and

  2. Document the organisational s and

  3. Specify the 's for each appointment

  4. Establish the project workflow and access permissions

  5. Review the against defined

  6. Appoint individuals to undertake the function

1 headline and 10 detailed Action Statements are recorded. 6 key detailed actions are shown here, with accepted actions first. Read all Action Statements in the Full Scenario Record (opens in a new tab)

What this role works with

Information Uses recorded for this scenario. Review their suitability for the intended organisation and project.

Uses, Artefacts, and Tools12 items
  1. 1Common Data Environment (CDE) solution and workflow
  2. 2Information management function schedule and resourcing records
  3. 3Project information standard
  4. 4Project Information Requirements (PIR)
  5. 5Exchange Information Requirements (EIR)
  6. 6Organisational Information Requirements (OIR)
  7. 7Asset Information Requirements (AIR)
  8. 8Master Information Delivery Plan (MIDP)
  9. 9Project information protocol
  10. 10Information production methods and procedures
  11. 11Asset Information Model (AIM)
  12. 12Federated Information Model

How the scenario unfolds

6 stages · 1 decision with 2 options

Open a stage to see its activities and decisions. Guidance links open the matching section of the Record in a new tab.

Does the mandate apply?

Ireland – CWMF / Public Works. Applies

As the appointing party (client), you carry the CWMF BIM requirements into the appointments your organisation's public works projects make, from each milestone's date. In force at 28/10/2026: design team (lead appointed / appointed parties), over €5m from 01/07/2026; contractors & supply chain, over €10m from 01/01/2026. Every appointment is covered: design team (lead appointed / appointed parties) from 01/07/2027; contractors & supply chain from 01/01/2028.

Source: CWMF – Public Sector BIM Adoption Timeline. https://cwmf.gov.ie/en/resources/bim/public-sector-bim-adoption-timeline/

Build Digital materials

The material selection and source metadata recorded for this issue. Proposed uses explain how each material supports the workflow; source availability may change.

Supporting materials

This project information standard provides spreadsheet templates and guidance for naming project information in accordance with the Irish National Annex to ISO 19650-2. The support includes the core file-naming workbook, a hyperlink checker, a presentation and a demonstration.

Standard · XLSX

Enforce standardised file naming across all project participants in alignment with the Irish National Annex.

Directly supports establishing the project information standard and verifying submitted container naming compliance.

Included resources

Form for assessing the applicability of Irish BIM mandate requirements to a project.

Tool · XLSX

Verify the mandatory BIM requirements applicable to the school extension project based on capital threshold.

Assists the Information Manager in confirming which phase of the CWMF Public Sector BIM Adoption Timeline applies to the €14m project and what milestones apply.

This organisational information-management plan provides client templates for use before starting the delivery of an asset. It supports the Employer, Client or Sanctioning Authority in preparing information-management requirements in line with ISO 19650.

Plan · XLSX

Structure organisational information management governance and templates before embarking on asset procurement.

Provides the appointing party with standard templates to formulate OIR and AIR in compliance with ISO 19650.

Included resources

This support presents the CWMF-to-ISO 19650-2 process workflows, including the Stage (i) feasibility study and preliminary report workflow. It is published as a single PDF support for information-management activities across appointing and appointed parties.

Workflow · PDF

Map traditional CWMF project stages to ISO 19650-2 delivery activities and appointing party decision points.

Crucial for aligning Irish public sector capital stages with exchange information requirements and gateway sign-offs.

Included resources

Editable appointing-party workbook covering requirements, responsibilities, mobilisation and delivery planning.

Plan · XLSX

Author comprehensive appointing party requirements and information protocols for inclusion in the appointment documents.

Furnishes editable workbooks required to assemble project-level EIR and information standards for procurement.

Information management requirements for the operational phase of assets.

Guide · PDF

Guide operational phase information requirements and handover procedures under ISO 19650-3.

Informs the formulation of asset requirements and the protocol for transitioning data containers from PIM to AIM.

This report defines Information Manager (BIM) role profiles for the Irish built-environment sector. It supports the development of the digital capability needed for more transparent, consistent and long-term infrastructure delivery.

Report · PDF

Define clear responsibilities and capabilities for client information management personnel and appointed parties.

Guides the client in appointing individuals to the information management function and allocating tasks.

Included resources

Guidance for applying Uniclass within Irish BIM mandate and project-delivery requirements.

Guide · PDF

Standardise classification tables across design elements and operational school assets under Irish public works.

Ensures that asset tagging in the EIR and model checks adheres to the classification tables (for example Uniclass) adopted in the ETB's information standard.

This technology evaluation method provides a structured and transparent approach for assessing digital tools that support Information Management and Building Information Modelling (BIM). It establishes consistent criteria for evaluating functionality, interoperability, usability, compliance with standards such as ISO 19650, and alignment with organisational needs. The method supports objective comparison, informed decision-making, and proportionate investment, ensuring that technology acts as an enabler of defined processes rather than a driver in itself. Overall, it helps organisations select and implement technology solutions that are fit for purpose, scalable, and supportive of long-term Information Management / BIM adoption and continuous improvement.

Protocol · XLSX

Provide structured criteria for selecting and testing Common Data Environment platforms against ISO 19650 standards.

Assists the client in evaluating CDE functionality, security permissions, and workflow capabilities.

Included resources

About this Role-based Scenario (Persona)

This report introduces a role, its situation and a practical workflow. Use it to consider how the guidance applies to your responsibilities. The Full Scenario Record provides practical stage guidance, Learning Units, supporting materials and the review record.

Read practical guidance in the Full Scenario Record (opens in a new tab)
Organisation:
Public client · Public sector
Appointment:
Appointing party
Project value:
OJEU (€5.5m–€15m)
Jurisdiction:
Ireland – CWMF
Prepared by:
Build Digital
RbS Code:
SP-3F2O4UTY
Issue date:
28/10/2026

Prepared by Build Digital using the Roles, Profiles, and Flows (RPF) app. RPF is developed by ChangeAgents AEC and is available as part of the BIM Excellence Initiative (BIMei).

Generated by the BIMei Scenario Builder. rpf.bimexcellence.org. Client preset.

Disclaimer: this Scenario Report is a decision support tool; it does not by itself establish a legal or contractual requirement. For more information please refer to BIMei Terms of Use.