Action statements library
The atomic units of the competence framework. Each action statement is a measurable unit that can be attached to one or more profiles.
- Total
- 836
- Action
- 339
- Enquiry
- 494
- Capability
- 2
- Unclassified
- 1
- Define (x)CI-AFD-4040-1-1
Identify clash detection prerequisites
- Clash Detection
- Define (x)CI-AFD-4040-1-2
Define clash resolution criteria to be met
- Clash Detection
- Define (x)CI-AFD-4040-1-3
Define clash detection cycles
- Clash Detection
- Define (x)CI-AFD-4040-1-4
Define clash detection methods
- Clash Detection
- Assess (x)CI-AFD-4040-2-1
Check naming for compliance and consistency
- Clash Detection
- Assess (x)CI-AFD-4040-2-2
Check control elements for precision and accuracy
- Clash Detection
- Assess (x)CI-AFD-4040-2-3
Check models for element omission or duplication
- Clash Detection
- Assess (x)CI-AFD-4040-2-4
Check models for data corruption and errors
- Clash Detection
- Assess (x)CI-AFD-4040-4-1
Check control items for misalignment
- Clash Detection
- Define (x)CI-AFD-4040-4-2
Identify method to apply in clash detection cycle
- Clash Detection
- Do (x)CI-AFD-4040-5-1
Perform visual clash detection check
- Clash Detection
- Do (x)CI-AFD-4040-5-2
Run automated clash detection script
- Clash Detection
- Do (x)CI-AFD-4040-6-1
Classify issues detected
- Clash Detection
- Do (x)CI-AFD-4040-6-2
Prioritise issues detected
- Clash Detection
- Do (x)CI-AFD-4040-7-1
Isolate issues not yet resolved
- Clash Detection
- Do (x)CI-AFD-4040-7-2
Document lessons learned
- Clash Detection
- Determine [attribute] of (x)CI-AS-0006
Determine project costs based on BIM DeliverableBIM Deliverable — Description unavailable.s rather than on the number of 2D Drawing2D Drawing — Description unavailable.s required
- BIM Deliverable
- 2D Drawing
- Do (x)CI-AS-0201
Use BIModelBIModel — Description unavailable.s to visualize AssetAsset — Description unavailable.s captured through PhotogrammetryPhotogrammetry — Description unavailable.
- BIModel
- Asset
- Photogrammetry
- Do (x)CI-AS-0217
Use BIModelBIModel — Description unavailable.s for Clash DetectionClash Detection — Description unavailable.
- BIModel
- Clash Detection
- Determine if (x) has occurredCI-AS-0493
Establish if an organisation has implemented technology solutions for integrating AssetAsset — Description unavailable. data across the Asset Life CycleAsset Life Cycle — Description unavailable.
- Asset
- Asset Life Cycle
- Do (x)CI-AS-0494
Provide information about the implemented technology solution that integrates AssetAsset — Description unavailable. data across the Asset Life CycleAsset Life Cycle — Description unavailable.
- Asset
- Asset Life Cycle
- Identify (x)CI-AS-0519
Establish if an organisation has experience in defining Information RequirementInformation Requirement — Description unavailable.s covering the use and maintenance of AssetAsset — Description unavailable.s
- Information Requirement
- Asset
- Define (x)CI-AS-0520
Define the Information Requirements covering the use and maintenance of AssetAsset — Description unavailable.s
- Information Requirements
- Asset
- Identify (x)CI-AS-0535
Identify the AssetAsset — Description unavailable.s that require their InformationInformation — Description unavailable. to be managed
- Asset
- Information
- Identify (x)CI-AS-0550
Identify the assetasset — Description unavailable.s for which informationinformation — Description unavailable. shall be managed
- Asset
- Information