Action statements library
The atomic units of the competence framework. Each action statement is a measurable unit that can be attached to one or more profiles.
- Total
- 836
- Action
- 339
- Enquiry
- 494
- Capability
- 2
- Unclassified
- 1
- Determine [attribute] of (x)CI-AS-0006
Determine project costs based on BIM DeliverableBIM Deliverable — Description unavailable.s rather than on the number of 2D Drawing2D Drawing — Description unavailable.s required
- BIM Deliverable
- 2D Drawing
- Do (x)CI-AS-0073
Use BIModelBIModel — Description unavailable.s for 2D Documentation2D Documentation — Description unavailable.
- BIModel
- 2D Documentation
- Identify (x)CI-AS-0077
Identify an organisation's BIM GoalBIM Goal — Description unavailable.s and BIM ObjectiveBIM Objective — Description unavailable.s
- BIM Goal
- BIM Objective
- Do (x)CI-AS-0193
Use BIModelBIModel — Description unavailable.s for 3D Detailing3D Detailing — Description unavailable. of assemblies and component relations
- BIModel
- 3D Detailing
- Do (x)CI-AS-0241
Use BIModelBIModel — Description unavailable.s for 3D Printing3D Printing — Description unavailable.
- BIModel
- 3D Printing
- Define (x)CI-AS-0600
Define the BIM GoalBIM Goal — Description unavailable.s and BIM ObjectiveBIM Objective — Description unavailable.s to be achieved by using BIM on a projectproject — Description unavailable.
- BIM Goal
- BIM Objective
- Project
- Do (x)CI-AS-0695
Manage and maintain the storage of data, documents, 2D Drawing2D Drawing — Description unavailable.s and BIModelBIModel — Description unavailable.s
- 2D Drawing
- BIModel