Sample transformation
How a transformation map reads
Follow two lines from legacy roles to future-ready ones. They converge at an interchange, clear a stop-gate, and one route is still a dashed candidate awaiting a panel vote.
Station sequence
Legacy role to future-ready role.
Map narration for screen readers
This is the bim-manager transformation metro map for ZZZ. The map contains 6 stations on 2 lines, with 1 stop-gates and 3 cited materials.
Lines
- Line 1 (#10B981): 4 stations from Document controller to Information delivery manager.
- Line 2 (#3F6CF7): 3 stations from Maintenance planner to Asset information strategist.
Stations in reading order
- Station 1: Document controller. Kind: Origin (legacy role). Importance: 2/4.
- Station 2: Maintenance planner. Kind: Origin (legacy role). Importance: 2/4.
- Station 3: Model coordinator. Kind: Hybrid (transitional). Importance: 2/4.
- Station 4: Information integrator. Kind: Interchange. Importance: 3/4.
- Station 5: Information delivery manager. Kind: Terminus (future-ready role). Importance: 4/4.
- Station 6: Asset information strategist. Kind: Terminus (future-ready role). Importance: 3/4.
Stop-gates
- After Model coordinator, gate MU-clash-detection.
Hurdles
- Between Information integrator and Asset information strategist: Awaiting panel vote.
Transformations
- Document controller becomes Model coordinator — Verified both sides.
- Model coordinator becomes Information integrator — Documented both sides.
- Information integrator becomes Information delivery manager — One side documented. Information delivery manager has no documented flow yet.
- Maintenance planner becomes Information integrator — Not yet documented.
Evidence receipts
Every citation counted by the sample is listed here. Numbered markers on the map point to the same receipt numbers.
- 1
ISO 19650-1 — Concepts and principles
Sample Standards Body
Defines the information-management principles for the asset life cycle.
Supports the overall method and context for the sample map.
Open source - 2
Sample clash-detection good-practice guide
Sample Institute
Sets out a workable clash-detection workflow and acceptance thresholds.
Supports the transition after Model coordinator.
Open source - 3
Sample BIM competency framework
Sample Council
Maps competencies across the modelling-to-management progression.
Supports the transition after Information integrator.
Open source
Start from your own role and see how it maps against future-ready capabilities.
Read the methodology behind stations, stop-gates, evidence and panel review.
Return to the transformation hub and browse canonical map availability.