Aggregated stage-level gap flags from every published flow. Drives Phase-3 scope: each row is a place where the BIM ecosystem doesn't yet provide adequate support for the profile.
| high | Lead designer on a CWMF public-works project — Ireland PW-D-PBUOCIGM | 06 Handover & asset information | No worked example exists mapping CWMF stage gates to ISO 19650-2 information milestones for design-led appointments; teams re-derive the mapping per project. | open | explainer |
| high | Small-practice architect — modest CWMF project PW-SP-ARCH-MODEST-CWMF | 02 Information requirement specification | No sole-practitioner-scale TIDP guide exists; current Build Digital TIDP guidance assumes a multi-discipline team. Raised in 4 of 7 ArcDox practitioner workshops as the most frequent stuck-point. | open | guide |