→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Risk Management Profile
02 · Competence·Specialized profile

Risk Management Profile

CP-PRM-RISK-004·Publishedv1.0.0
Risk Management Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 1
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles1
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

A08 Risk Management (2)

  • Identify and evaluate the risks associated with Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0021
    IRI 4 · RequiredICI 3 · Advanced
  • Establish if there are any insurance policies covering the generation, use, and exchange of BIModelBIModel — Description unavailable.s
CI-AS-0421
IRI 3 · ExpectedICI 2 · Intermediate

A07 Contract (5)

  • Identify all issues related to Intellectual Property (IP) and ownership of BIModelBIModel — Description unavailable.s or Model ComponentModel Component — Description unavailable.s
    CI-AS-0072
    IRI 4 · RequiredICI 3 · Advanced
  • Develop BIM-specific Contractual ClauseContractual Clause — Description unavailable.s for clarifying ownership of BIModelBIModel — Description unavailable.s and/or Modelling Components
    CI-AS-0020
    IRI 4 · RequiredICI 3 · Advanced
    Develop BIM-specific Contractual ClauseContractual Clause — Description unavailable.s for clarifying ownership of BIModelBIModel — Description unavailable.s and/or Modelling ComponentModelling Component — Description unavailable.s
  • Identify which Intellectual Property and Moral Rights related to BIModelBIModel — Description unavailable.s are acknowledged
    CI-AS-0420
    IRI 3 · ExpectedICI 2 · Intermediate
  • Establish if the Intellectual Property (IP) and Moral Rights related to BIModelBIModel — Description unavailable.s are acknowledged
    CI-AS-0419
    IRI 3 · ExpectedICI 2 · Intermediate
  • Identify the BIM-specific Contractual ClauseContractual Clause — Description unavailable.s needed to enforce compliance with project requirements
    CI-AS-0018
    IRI 3 · ExpectedICI 2 · Intermediate