→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Practice Standards Management Profile
02 · Competence·Specialized profile

Practice Standards Management Profile

CP-PRM-STD-002·Publishedv1.0.0
Practice Standards Management Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 1
  • items 8
  • info uses 0
  • Overview
  • Lineage
  • Linked roles1
  • Items8
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

I07 Guides and Manuals (1)

  • Develop a BIM GuideBIM Guide — Description unavailable. or BIM ManualBIM Manual — Description unavailable. for use by an organisation
    CI-AS-0054
    IRI 4 · RequiredICI 3 · Advanced

A01 Administration, Policies and (1)

  • Develop a Software Usage PolicySoftware Usage Policy — Description unavailable.
CI-AS-0024
IRI 4 · RequiredICI 3 · Advanced

I04 Standardization and Templates (3)

  • Develop standardized Internal BIM WorkflowInternal BIM Workflow — Description unavailable.s for initiating and delivering projects
    CI-AS-0051
    IRI 4 · RequiredICI 3 · Advanced
  • Generate standardized templates, checklists or workflows for initiating and delivering BIM ProjectBIM Project — Description unavailable.s
    CI-AS-0689
    IRI 4 · RequiredICI 3 · Advanced
  • Develop multiple BIM Software ToolBIM Software Tool — Description unavailable. templates for use on different types of BIM ProjectBIM Project — Description unavailable.s
    CI-AS-0045
    IRI 3 · ExpectedICI 2 · Intermediate

T04 Modelling (1)

  • Establish a set of Naming ProtocolNaming Protocol — Description unavailable.s covering models, components, parameters, details, etc.
    CI-AS-0111
    IRI 4 · RequiredICI 3 · Advanced

I06 System and Process Testing (2)

  • Evaluate the suitability of Internal BIM WorkflowInternal BIM Workflow — Description unavailable.s after a BIM ProjectBIM Project — Description unavailable. has been delivered or completed
    CI-AS-0052
    IRI 3 · ExpectedICI 2 · Intermediate
  • Use checklists to conduct procedural audits on Internal BIM WorkflowInternal BIM Workflow — Description unavailable.s
    CI-AS-0053
    IRI 3 · ExpectedICI 2 · Intermediate