→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Model-based Quantity Take-off Profile
02 · Competence·Specialized profile

Model-based Quantity Take-off Profile

CP-BIM-QTO-004·Publishedv1.0.0
Model-based Quantity Take-off Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 6
  • items 4
  • info uses 0
  • Overview
  • Lineage
  • Linked roles6
  • Items4
  • Info uses0
  • Recognition
  • Sources1
  1. 6Linked roles6 roles use this profile→
  2. Model-based Quantity Take-off ProfileCP-BIM-QTO-004
    →
  3. 4Competency itemsacross 3 topics
Model-based Quantity Tak…Model-based Quantity Take-off ProfileProfileBIM CoordinatorDR-BRA-BIM-COORD-001Junior ArchitectDR-BRA-JR-ARCH-001Junior Civil EngineerDR-BRA-JR-CIV-001Junior Mechanical En…Junior Mechanical EngineerDR-BRA-JR-MECH-001Project ManagerDR-BRA-PM-001BIM ManagerDR-BRA-BIM-MGR-001Use [[BIModel]]s for [[Qua…Use [[BIModel]]s for [[Quantity Take-off]]CI-AS-0227Use [[BIModel]]s for [[Cos…Use [[BIModel]]s for [[Cost Estimation]]CI-AS-0221Determine project costs ba…Determine project costs based on [[BIM Deliverable]]s rather than on the number of [[2D Drawing]]s requiredCI-AS-0006Organise models, documents…Organise models, documents, project information, cost information and specifications according to standardised [[Classification System]]s (e.g. Uniclass, NRM and CESMM)CI-AS-0030
Relationships: Model-based Quantity Take-off Profile