→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●Construction Execution Profile
02 · Competence·Specialized profile

Construction Execution Profile

CP-BIM-CM-002·Publishedv1.0.0
Construction Execution Profile — from v1.4 report; seed to be curated.

(no description)

?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type specialized
  • roles 1
  • items 7
  • info uses 0
  • Overview
  • Lineage
  • Linked roles1
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

O05 Constructing and Fabricating (6)

  • Use BIModelBIModel — Description unavailable.s for the specific purposes of construction and fabrication
    CI-AS-0675
    IRI 4 · RequiredICI 3 · Advanced
  • Use BIModelBIModel — Description unavailable.s for Construction Waste ManagementConstruction Waste Management — Description unavailable.
CI-AS-0246
IRI 3 · ExpectedICI 2 · Intermediate
  • Use BIModelBIModel — Description unavailable.s for Concrete PrecastingConcrete Precasting — Description unavailable.
    CI-AS-0244
    IRI 3 · ExpectedICI 2 · Intermediate
  • Use BIModelBIModel — Description unavailable.s for Sheet Metal FormingSheet Metal Forming — Description unavailable.
    CI-AS-0248
    IRI 3 · ExpectedICI 2 · Intermediate
  • Use BIModelBIModel — Description unavailable.s for 3D Printing3D Printing — Description unavailable.
    CI-AS-0241
    IRI 3 · ExpectedICI 2 · Intermediate
  • Use BIModelBIModel — Description unavailable.s for Mechanical Assemblies PrefabricationMechanical Assemblies Prefabrication — Description unavailable.
    CI-AS-0247
    IRI 3 · ExpectedICI 2 · Intermediate
  • O07 Monitoring and Controlling (1)

    • Use BIModelBIModel — Description unavailable.s for Field BIMField BIM — Description unavailable.
      CI-AS-0258
      IRI 4 · RequiredICI 3 · Advanced