→Sign in
Explore
  • Roles
  • Profiles
  • Flows
  • Jurisdictions
Tools
  • Analysers
  • Transform My Role
  • Compare
  • Transformations
  • Matrices
Reference
  • Library
  • Framework
  • Glossary
  • Help
  • About
Creative Commons
BIMe Initiative by:CHANGE AGENTS AEC
Contact UsSubscribePrivacyTermsHome
Roles, Profiles & Flows
RolesProfilesFlowsAnalysersTransformCompareJurisdictionsLibraryHelpAbout
  1. Home
  2. /
  3. Profiles
  4. /
  5. ●BIM Collaboration Profile
02 · Competence·Core profile

BIM Collaboration Profile

CP-BIM-COL-002·Publishedv1.0.0
Collaboration processes, exchange readiness, and multidisciplinary coordination foundations.
A core profile for structured collaboration across roles and disciplines.
?What is this?
About profiles

A profile is a structured collection of competency statements grouped around a specific persona (e.g. Information Manager, BIM Coordinator).

IRI = Importance / Required Importance — how critical the competency is to the role, on a 0–4 scale. ICI = Innate / Capability Innate — the baseline capability expected before training, also 0–4.

Items are action statements drawn from a competency framework. Each item carries an IRI and ICI score that help organisations plan hiring and development.

Roles linked here are organisational roles that share responsibility for the competencies in this profile. A flow authored for this profile guides those roles through delivering the competencies.

  • type core
  • roles 16
  • items 7
  • info uses 0
Context
jurisdictionhigh
  • Overview
  • Lineage
  • Linked roles16
  • Items7
  • Info uses0
  • Recognition
  • Sources1

Competency items

Action statements included in this profile, grouped by competency topic. Each item's IRI (responsibility) and ICI (expected proficiency) are shown.

Seed items

collaboration (1)

  • Coordinate model-based collaboration activities between project participants.
    CI-BIM-COL-001
    IRI 4 · RequiredICI 3 · Advanced
    Coordinate model-based collaboration

F02 Collaboration (1)

Negotiate Data Exchange ProtocolData Exchange Protocol — Description unavailable.s with other Project ParticipantProject Participant — Description unavailable.s at/before the start of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
CI-AS-0026
IRI 4 · RequiredICI 3 · Advanced

F03 Facilitation (1)

  • Act as a BIM FacilitatorBIM Facilitator — Description unavailable. during the delivery of Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0027
    IRI 4 · RequiredICI 3 · Advanced

T08 Document Management (1)

  • Establish the processes and procedures to be used by Project ParticipantProject Participant — Description unavailable.s within Common Data EnvironmentCommon Data Environment — Description unavailable.
    CI-AS-0113
    IRI 4 · RequiredICI 3 · Advanced

O04 Simulating and (1)

  • Use BIModelBIModel — Description unavailable.s for Code Checking & ValidationCode Checking & Validation — Description unavailable.
    CI-AS-0218
    IRI 4 · RequiredICI 3 · Advanced

F05 Team and Workflow (1)

  • Form work teamwork team — Description unavailable.s that are competent in managing BIModelBIModel — Description unavailable.s
    CI-AS-0583
    IRI 3 · ExpectedICI 2 · Intermediate

A01 Administration, Policies (1)

  • Develop documented procedures for Information FlowInformation Flow — Description unavailable.s during Collaborative BIM ProjectCollaborative BIM Project — Description unavailable.s
    CI-AS-0025
    IRI 4 · RequiredICI 3 · Advanced