Model coordination & clash detection — ABNT NBR ISO 19650 & Decreto 10.306 (Brazil)
A BIM Coordinator runs the model-coordination cycle on a Brazilian delivery-phase project: confirming the BIM BR mandate context (Decreto 10.306/2020), aligning the BIM Execution Plan with ABNT NBR ISO 19650-2, federating discipline models with NBR 15965 classification, and driving clash-detection cycles through to accepted information deliverables.·Linked profile: BIM Fundamentals Profile·Journey for BIM Coordinator
An authored guide. Not yet confirmed by a verification panel.
🇧🇷BRA
Six-stage navigational layer linking the coordinator to the ABNT NBR ISO 19650-1/2 clauses, the Decreto 10.306 mandate, BIM-BR programme guidance, and BIM Forum Brasil competency references that govern each stage of the coordination journey.
Project context: Anchored to the canonical Clash Detection AFD (AFD.4040.V0.1); calibrated for public-sector projects in scope of the BIM BR strategy.
22. Prepare discipline or speciality models for federation
33. Federate discipline or speciality models
55. Perform interference check on federated model
2.12.1. Check naming for compliance and consistency
2.42.4. Check models for data corruption and errors
2.22.2. Check control elements for precision & accuracy
2.32.3. Check models for element omission or duplication
1.41.4. Define clash detection methods
5.15.1. Perform visual clash detection check
5.25.2. Run automated clash detection script
4.14.1. Check control items for misalignment
4.24.2. Identify method to apply in clash detection cycle
66. Analyse issues detected by interference check
6.16.1. Classify issues detected
6.26.2. Prioritise issues detected
77. Resolve issues detected by interference check
7.17.1. Isolate issues not yet resolved
01
Mandate context & appointment
●IM responsibility · Lead Appointed Party — BIM coordination function
Confirm the project's position under the BIM BR mandate and the coordinator's appointment within the delivery team.
Embedded guidance
Decreto 10.306/2020 phases BIM into federal works: design uses from 2021, construction from 2024, and full lifecycle from 2028. Confirm which phase applies and record it in the appointment.
Verify whether the contracting body mandates BIM under the Decreto or by tender condition
Confirm the coordination role and authority in the appointment documents (ABNT NBR ISO 19650-2 §5.1)
Register the appointing party's exchange information requirements as the coordination baseline
●IM responsibility · Lead Appointed Party — BIM Coordinator with task-team leads
Align the BIM Execution Plan with ABNT NBR ISO 19650-2 and mobilise the task teams it commits.
Embedded guidance
The BIM Execution Plan is the coordination contract. Map each task team's deliverables to the master information delivery plan before models start arriving.
Consolidate task-team capability and capacity assessments (§5.3.2)
Fix the federation strategy and model breakdown in the BEP
Agree naming, origin, units and classification conventions up front