Action statements library
The atomic units of the competence framework. Each action statement is a measurable unit that can be attached to one or more profiles.
- Total
- 836
- Action
- 339
- Enquiry
- 494
- Capability
- 2
- Unclassified
- 1
- Do (x)CI-AS-0051
Develop standardized Internal BIM WorkflowInternal BIM Workflow — Description unavailable.s for initiating and delivering projects
- Internal BIM Workflow
- Determine [attribute] of (x)CI-AS-0052
Evaluate the suitability of Internal BIM WorkflowInternal BIM Workflow — Description unavailable.s after a BIM ProjectBIM Project — Description unavailable. has been delivered or completed
- Internal BIM Workflow
- BIM Project
- Assess (x)CI-AS-0053
Use checklists to conduct procedural audits on Internal BIM WorkflowInternal BIM Workflow — Description unavailable.s
- Internal BIM Workflow
- Define (x)CI-AS-0069
Define a hierarchy of responsibilities needed to improve Internal BIM WorkflowInternal BIM Workflow — Description unavailable.s
- Internal BIM Workflow
- Do (x)CI-AS-0201
Use BIModelBIModel — Description unavailable.s to visualize AssetAsset — Description unavailable.s captured through PhotogrammetryPhotogrammetry — Description unavailable.
- BIModel
- Asset
- Photogrammetry
- Do (x)CI-AS-0215
Use BIModelBIModel — Description unavailable.s for Acoustic AnalysisAcoustic Analysis — Description unavailable.
- BIModel
- Acoustic Analysis
- Establish if (x) is availableCI-AS-0411
Establish the availability of an appointed BIM Adoption DriverAdoption Driver — Description unavailable.
- Adoption Driver
- Identify (x)CI-AS-0412
Identify the BIM Adoption DriverAdoption Driver — Description unavailable.
- Adoption Driver
- Do (x)CI-AS-0413
Provide information on the BIM Adoption DriverAdoption Driver — Description unavailable.
- Adoption Driver
- Identify (x)CI-AS-0414
Identify the date the BIM Adoption DriverAdoption Driver — Description unavailable. was appointed
- Adoption Driver
- Determine if (x) has occurredCI-AS-0493
Establish if an organisation has implemented technology solutions for integrating AssetAsset — Description unavailable. data across the Asset Life CycleAsset Life Cycle — Description unavailable.
- Asset
- Asset Life Cycle
- Do (x)CI-AS-0494
Provide information about the implemented technology solution that integrates AssetAsset — Description unavailable. data across the Asset Life CycleAsset Life Cycle — Description unavailable.
- Asset
- Asset Life Cycle
- Identify (x)CI-AS-0519
Establish if an organisation has experience in defining Information RequirementInformation Requirement — Description unavailable.s covering the use and maintenance of AssetAsset — Description unavailable.s
- Information Requirement
- Asset
- Define (x)CI-AS-0520
Define the Information Requirements covering the use and maintenance of AssetAsset — Description unavailable.s
- Information Requirements
- Asset
- Identify (x)CI-AS-0535
Identify the AssetAsset — Description unavailable.s that require their InformationInformation — Description unavailable. to be managed
- Asset
- Information
- Identify (x)CI-AS-0550
Identify the assetasset — Description unavailable.s for which informationinformation — Description unavailable. shall be managed
- Asset
- Information
- Determine [attribute] of (x)CI-AS-0586
Evaluate the suitability of Internal BIM WorkflowInternal BIM Workflow — Description unavailable.s to deliver a BIM ProjectBIM Project — Description unavailable.
- Internal BIM Workflow
- BIM Project
- Establish if (x) is availableCI-AS-0778
Establish the availability of an appointed Adoption DriverAdoption Driver — Description unavailable.
- Adoption Driver
- Identify (x)CI-AS-0795
Identify the Player GroupPlayer Group — Description unavailable.s appointed as the Adoption DriverAdoption Driver — Description unavailable.
- Player Group
- Adoption Driver
- Do (x)CI-AS-0818
Provide information about the Adoption DriverAdoption Driver — Description unavailable.s
- Adoption Driver